King Living

This 62-tonne job, completed over two 4-week stages, was particularly unique as we worked around an existing steel structure.

Photography:
A steel frame structure with a crane in the background

Client

FDC Construction & Fitout

Location

South Australia

Completed

Stage 1

February 2024

Stage 2

September 2024

Duration

8 weeks

Tonnage

62

t

Stevens group are a very high-quality, professional structural steel contractor who we recommend for any project

Gareth Arentz

FDC

A steel frame structure with a crane in the background

Speak with us