Enfield Memorial Park was a new purpose built building to increase capacity at the existing memorial park. Design was complex with a smaller circle integrated into a larger circle which combined required nearly 400t of steel.
With the building being completed by Kennett builders and both Walterbrooke and MottMac designing the structure, shop detailing was completed at Stevens Group and took 2300 hours to complete, highlighting the complex design with a 2 degree fall incorporated into the building footprint.